Pick one or many scopes · the form adapts · edit any rate
This quotation is finalised, or deemed finalised, only upon approval by the Management.
Saved Drafts
Work auto-saves as you go; use this to keep a named copy you can reopen later.
No saved drafts yet.
Revise an Existing Quote — optional
Revision mode is ON. Every field is locked to its existing value; type the new value in the highlighted “→ change to” cell beneath any field you want to change. Cells left blank carry forward unchanged, and every change is listed automatically for the brain.
Download the quote's JSON from ERPNext, import it here, then turn on Revision mode to amend.
Advanced — paste the previous quotation JSON manually
Company & Client
Plot Orientation — rotate to the plot's facing; enter each side's dimension and what adjoins it (road / other property)
Rear
Left
Right
Front
Facing = direction the plot front / road side faces · area appears when all four sides are entered
Scope — tick one or several; sections below appear to match
Design Services — editable rates
Floor Configuration — applies to any scope; rate column shows only for Execution/Finishing
Ground only
G+1
G+2
G+3
G+4
+ Mumty
or set exact floors above ground:
Site Measurements — edit qty, rate or per-item discount; blank = brain asks
Item
L (ft)
B (ft)
Height
Area (sqft)
Rate ₹/sqft
Disc %/₹
Amount
Septic Tank
Waterproofing
Ghotai
Parapet Wall 2×(L+B)×H · plot/struct
Drainage + Ghotai (lump)
Execution — Material Specifications — editable; add or remove rows
Item
Specification
Finishing — Material Specifications — editable brand / spec per item; add or remove rows
Site & Excavation Figures — editable project assumptions
Custom / Ad-hoc Items — amount = qty × rate
Description
Type
Floor
Unit
Qty
Rate ₹
Disc %/₹
Amount ₹
Terms & Conditions — pulled per scope from your standard sets
edit construction clauses
edit design clauses
Always included, locked: This quotation is finalised, or deemed finalised, only upon approval by the Management.
These are the standard clauses for this quote. Edit any title or wording, delete clauses you don't want, or add new ones — the PDF shows exactly this list (plus the locked line above). Leave this unticked to use the standard clauses automatically.
Bill of Quantities (BOQ) — live preview of the contract BOQ; edit here and the source fields update too
Description
Floor
L
B
Qty/Area
Unit
Rate ₹
Amount ₹
TOTAL (before overall discount, GST extra)
Payment Schedule — the standard schedule is used automatically; tick to customise per client
Each stage is a % of the quote total; amounts are calculated automatically. Edit the % and the stage text, add or remove stages.